Showing posts with label Projects. Show all posts
Showing posts with label Projects. Show all posts

Thursday, December 22, 2011

Ever since moving in, I have been pretty slow to complete the various projects I have going around the house. I keep three excuses for my procrastination handy - either I have other things to do outside of work/house, other more important house-related issues pop up or I am just too tired/lazy after getting home from work.

As I usually do around Christmas time, I've taken an extended vacation to get my PTO balance down. The goal of these two weeks is to get little projects handled and prepare the house for the winter that has not yet happened.

Thanks to the distraction of Christmas shopping, I haven't really gotten around to many of the little projects yet. I have, however, accomplished a couple of small feats around the house and hope to wrap up a couple more before I go north for a few days for Christmas.
  • The new bathroom closet and enlarged linen closet have been framed. Between my own inexperience doing such things and a couple of the 2x4's being warped, I can't claim it to be the best job of framing ever but it doesn't look completely horrible. Also, as a side effect of framing the closets, the hole in the wall in the soon-to-be office is also framed.
  • The corner beading by the tub and sheetrock about the bathroom closet have been hit with two coats of joint compound. They are now ready to be sanded, cleaned and primed/painted.
  • The wall in the soon-to-be office is now filled with a panel of sheetrock. The aforementioned warped 2x4s mean that things don't like up exactly in the middle (but top and bottom is good). I am going to need to tear out the base boards in order to be able to really finish the sheetrock. I was not pleased to discover that the floors appear to have been installed after the base boards and which resulted in me accidentally destroying a good portion of one wall's worth. Guess I'll just have to redo the base boards when it comes time to renovate that room.
  • And lastly, I finally got around to finishing off the wood pile. Everything that I could split with an axe is now cut and stacked (since it was a nice 60 degrees outside, I opted to do this over handing more sheet rock or painting). I have two small piles of wood that remain - one that is split but had carpenter ants in it (which I will be bug bombing and leaving to exposure tomorrow) and one that I may have to rent a splitter for (they are all either awkward shapes or have massive knots in them that my axe won't split through). When all the wood is handled, I will have about a cord's worth that will sit and dry for next fall.
So, yeah. Not the busiest I could be on the house but I've been getting small projects out of the way. My primary goal for tomorrow is to get the sheetrock in the bathroom sanded, cleaned up and hit with a coat of primer at least. If I get going early enough, I may be able to do a second coat of primer. At that point, the bathroom will be a top coat away and seal pass away from being usable as a shower (that is, until the rest of the bathroom goes under the scalpel).

Thursday, November 24, 2011

Project # 4 - The Partial Death of Teal

While most of the rest of the country was celebrating Thanksgiving, my parents and I were knee deep in bathroom demolition. The house has two full baths in it but unfortunately, only one of them can really be used as a full bath (the master). The other bath, while having operation sink and toilet, the tub itself could not be used due to tile and subsequent water damage to the room.


As the family had celebrating Thanksgiving yesterday (due to the random and crazy schedule that some of the family members have), Mom and Dad came down to Franklin to check out the house and help with some demolition.

Day # 1

The primary goal for the weekend is to remove the tub and replace it with a new tub/surround as well as remove the closet from the bedroom next door and give the bathroom it's own little closet. As the bedroom next door is going to be an office space, I figured it lacking a closet would not hurt it. Including a small closet in the bathroom also means that access to the tub's pipes will now be more convenient through the bathroom itself instead of through the closet in the bedroom/office. As part of all this, the linen closet in the hallway is getting a little bit bigger as well, which is good because as it is currently it is barely deep enough to hold comforters and other large linens and towels.

Mom and Dad arrived in the early afternoon and after a tour, we set ourselves towards the demolition of the tub tile and drywall and closet framing.After a good 4 or 5 hours of demolition work, everything that we wanted torn was torn down. All that remains is a big pile of garbage that needs to be bagged up and moved into shed for storage until such a time that I have enough renovation garbage to call in a dumpster.

Once the demo was done, we called it a night. Tomorrow morning, I'll be bundling up the garbage to take to the shed. I have to stay at the house and wait for a Chimney Repair company to arrive to do an estimate for me. During that time, Mom and Dad will likely be out and about, braving the Black Friday Madness, trying to get to Home Depot and pick up a few supplies (and possibly the tub and surround, if Home Depot has it in stock).

(To Be Continued...)

Friday, November 11, 2011

Project # 3 - Painter's Anxiety

One would think that, having roots as an artist, I would be more comfortable with the prospect of painting the rooms in the house than I am. When asked what I was going to do for colors, my response was "off white". Some of it was that I didn't really want to invest too heavily into thinking about colors for each room when I know that I want to tear down the walls and hang new insulation and drywall on them (the current drywall is ancient and should be replaced). Luckily, the decision to make the Living Room a project room means that I don't have to care about it for the time being. But... I do have to think about the other living spaces.

The Dining Room
Originally, I was going to just leave it "primer white" with the green trim. But as I got further along in the priming, the more stark the space looked. And, since I would need another coat of primer to even out the white on the walls anyway, I just decided to paint them a color.


Jay had suggested something along the lines of an orange/brick color. I spent some time playing around in Photoshop and came up with a mockup that looked decent. Off to the paint store! While there, I got some suggestions from the woman running the register and went with a color called Audobon Russet.


I was very nervous about this color. Seeing it (approximated) in Photoshop is one thing, seeing it on the wall was another. By the time the first section of wall was done, I was pretty anxious about the color. The white walls of the primer, the pink of the cabinets and window dressings and the blue from the tape all make it look terrifying. But I had to press on - get to a point of no return that way I wouldn't have any choice but to finish painting.

Compared to the primer, this paint went on like butter. Nice smooth application and no question about whether or not you actually painted a spot (putting primer on yellow cream walls makes it hard to really see what you've covered and what you haven't). Because it went on so smoothly and because I had the benefit of experience from priming, painting the whole room went much faster than I thought it would.






Now all that is left is to check the walls today to see if they need another coat and see about getting rid of the pink paint in the corner units. Also - tear down the pink window dressing. And for a bonus task, see about replacing the illuminated jelly fish and updating the outlets to something modern.

The End Bedrooms
These two bedrooms got a start today as well. Primer went on the walls of one of them while the other looks like it is just primer white to begin with. Annoyingly, that primer white room also has white trim and windows, which is going to be an annoyance. It can be done but I would have preferred to just do the walls and be done with it.


For colors in these rooms, I am going with what I am comfortable with - a simple neutral cream/off-white color. Down the road, I might decide to get ambitious with their colors but for the time being, I am going simple. A gallon should handle both rooms easily.

Saturday, October 29, 2011

Project # 2 - Floors

Day # 1

When I first looked at the house, one of the aspects that immediately stood out to me as something I needed to change was the carpet. The living room, stairs to the second floor and second floor hallway were covered in ugly red carpet. I am not a fan of carpet so this had to change.


As can be seen in the pictures, ugly.

The original plan was to pull up the carpets, the tack strips and staples and just sand and refinish the spaces that had the carpet. However, after some advising, that plan has changed a bit. The carpets, tack strips and staples are still on tap for removal but all other floors are now going to be getting the sanding and sealing finish. It makes sense to try to give the house a uniform consistency in the floors. It might require more time, money and sweat than I had originally planned but it will result in a nicer overall finish to the house.

With a bit of light left in the day, I set to work tearing up the living room carpets. Happily, they weren't too difficult to get off the floor. The only remnants of the carpet in that room now is a lot of staples with tufts of carpet padding attached to them. While pulling up the padding, I noticed that there were even more staples in the floor. Guess this is the second time carpet was laid out on this floor.

 
Day # 2
Spent the morning tearing up the carpet in the second floor hallway and stairs. This carpet appears to be older than the carpet in the living room considering how aggressively stapled to the floor it was and how hazardous just handling the carpet was (nails and staples everywhere in it). Plus the padding was different and looked like it fell out of the 60s.


While the living room had more carpet to contend with, the hallway and stairs were more difficult. The above mentioned aggressive stapling being the chief difficulty but the variety of awkward shapes and frequent endings of lengths of carpet made it more challenging as well. That said, I needed only about an hour or so to get it and the padding underneath torn up. I can't wait to get those tacks and staples out and see what the floor looks like when it gets refinished.

Day #3
After a long day on Saturday plucking nails and staples, today seemed like a breeze. Its a good thing too - with the trees falling on the property I don't think I could have really managed dealing with that and stubborn staples. They were a great distraction while I waited for a Tree Removal service to arrive for an estimate.

As I was taking the final staples out of the living room, Pat and Marc showed up to lend a hand on the stairs and 2nd floor hall. Happily, even though the carpet was older, the staples and tack strips came up much more easily. Some of that I am sure is due to the better hammer Jay picked up the night before but I think some of it was also due to the lower traffic those areas of the house saw compared to the living room (which, aside from being a living room is also the primary access to the backyard and pool).

Within a couple of hours, the hall and stairs were done and we moved on to pulling ancient drape/blind hardware. The floors already look significantly better, both without the carpet and without the tufts of old carpet padding dotting them. After this, the plan is to get any holes filled, the floors sanded and a fresh new coat of sealant on them. That is a project for another time and will likely happen on a room-by-room basis.

Friday, October 28, 2011

Project #1 - Crash Pad


A little over a month ago, I had to put one of my ferrets, Crash, to sleep. I had him for nearly 5 years  and he was one of the best pets I had ever owned. Unfortunately, as is common with ferrets, he developed cancer.


This was fairly stressful for me, as I was in the midst of my house hunt. As much as I wanted to be able to take him to the vet and have them put him on some sort of treatment, I couldn't afford what would be needed for those treatments and afford the house at the same time (little known fact - houses are expensive). I wasn't completely sure I was going to get the house and because of that I was torn between burying him at my apartment in Walpole, getting him cremated or having the vet freeze him until such a time that I knew I would be moving. Ultimately, I decided I would bury him in Walpole and move him to the new house once I had gotten it.

After the closing today, I decided that the first project I had to undertake was seeing Crash to his new resting place. I was worried that the weather would force me to delay this. Yesterday was near-winter outside and the rest of the week before was miserable rain storms. Thankfully, today was nice and clear. Unfortunately, the rainy weather we've had all this fall resulted in the box I buried him in not holding together at all but the felt basket he was wrapped in had.

After I loaded up my car with the first boxes of the move, I brought Crash into the car as well (wrapped in a trash bag) and headed south. When I arrived in Franklin, I picked a good location where the property sloped up and dug his new resting place. Re-reading this post, it sounds a bit morbid. But this was a promise I made to myself when I had him put to sleep a month ago. He meant a lot to me and I didn't like the thought of leaving him behind.



RIP Crash